Manufacturing execution, evolved

Added value — delivered.

We optimize production schedules under real-world constraints: stock availability, quality rules, machine capabilities, and changeovers.

Startup Innovation for Smarter Manufacturing Execution

SCROLL TO EXPLORE

Execution plans that respect the factory floor.

PraviFlow is a production planning and flow optimization platform built for manufacturers managing complex, multi-machine operations.

It creates practical, constraint-aware production plans by balancing machine availability, product compatibility, changeover time, inventory levels, storage capacity, and upstream component requirements. Powered by advanced optimization algorithms, PraviFlow helps teams reduce downtime, minimize unnecessary changeovers, protect minimum-stock targets, and avoid costly overproduction.

With live planning progress, detailed machine timelines, shop-floor visibility, inventory and storage tracking, configurable downtime, and plan history, PraviFlow turns operational data into clearer decisions and more reliable production flow.

Explore our capabilities →
Multi-levelplanning logic

Each shop plan and its dynamic stock levels actively shape the upstream shop schedule.

Real-worldconstraint aware

Storage, quality, storage-unit, and global changeover constraints are all considered together.

Actionablefactory outputs

Exportable and printable plans, external-system integrations, and machine-ready ordering views.

The people behind the platform

Built by Experienced Experts in the Field

Our solution is created by experienced industrial engineers and IT experts. We combine deep knowledge of manufacturing processes with advanced optimization technology to deliver schedules that work in real life, not just on paper.

Engineering insightAlgorithmic power

Built for real complexity

Every constraint.
One intelligent plan.

PraviFlow turns production variables into decisions your team can trust — from the first production order to the final timeline.

01
⌘

Multistage production scheduling

Plan across the factory’s tiered shops, coordinating every production stage so each downstream machine stays supplied and aligned.

02
◒

Machine-aware scheduling

Account for downtime, capabilities, restrictions, changeover duration, and smarter changeover reduction.

03
◫

Inventory evolution simulation

See how inventory changes over time before committing your production plan, while protecting available storage capacity across the flow.

04
↗

Balanced optimization

Balance available storage with operational capacity while maximizing throughput, stock compliance, and lower changeovers.

05
⌁

Flexible refinement options

Run follow-up calculations and refinements to reduce overall changeovers and lower changeover concurrency.

06
▤

Connected operating plans

Share and export created plans, or show live updates directly on machine terminals.

Enterprise-ready by design

Technical foundations for confident adoption.

Your production intelligence remains secure, connected, and fully under your team's control.

01

Security & user control

Role-based permissions give every user the right level of access to plans, data, and operational actions.

02

Single sign-on

Integrate with your existing identity provider for a seamless, governed sign-in experience.

03

Full calculation API

Connect input data to the calculation engine and receive optimized outputs through a complete API.

04

Optional approvals

Add an approval workflow when your operating model requires review before a plan goes live.

05

Well documented

Clear documentation helps your IT and operations teams integrate, operate, and extend with confidence.

06

Latest IT standards

Built with the latest available industry standards in IT technology, for a modern and dependable platform.

See the plan, not just a score

Optimization you can see and use.

Move from a mathematically optimal answer to a complete execution view: production timelines, stock trajectories, and storage load.

Optimized multi-machine production Gantt chart
01 / FULL FACTORY VIEW

Multi-machine planning at a glance

Coordinate work across every machine, surface conflicts early, and make the planning horizon clear to operations teams.

Gantt timelineMachine capabilityChangeovers
Optimized single-machine production Gantt chart
02 / FOCUSED EXECUTION

Single-machine planning

Zoom into every job sequence, duration, and setup decision.

Stock evolution timeline for an inventory dimension
03 / INVENTORY CONFIDENCE

Single-dimension evolution

Confirm minimum cover and target stock across the run.

Storage area occupancy timeline
04 / STORAGE CONTROL

Total storage flow

Track capacity utilization as material moves through the plan.

Limited pilot availability

Start Your Pilot

Bring your hardest scheduling challenge. We’ll show you what a production plan built around reality can look like.

Don’t waste your resources anymore.

01

Share your workflow
02 See your pilot plan
03 Move with confidence

By submitting, you agree to be contacted about PraviFlow.